Is it possible to take over an unfinished software project in Alanya?: A Solution Guide

5 min read
yarım kalan yazılım projesi devralma

This post was automatically translated from the Turkish original.

The Reality of Taking Over an Unfinished Software Project

Many business owners in Alanya face a similar situation: a system they ordered from a software company is left unfinished, the contractor breaks down, or the project collapses, leaving them unsure what to do. Of course, the software code for the inherited project must be available and accessible. But the problem usually doesn't start here—it starts at the beginning.

Yes, an unfinished software project can be taken over. However, this takeover process is often more complex, more expensive, and riskier than building a project from scratch. We explain why and how to proceed in this article.

Why is it difficult to take over an unfinished project?

Code Quality and Documentation

A software team taking over completed code must first understand the state of the code. If the original developer hasn't left any code documentation , the new team will have to read the code line by line, trying to guess what they did. This is time-consuming, costly, and opens the door to errors.

Poorly written, untested, or substandard code can turn the inheritance process into a nightmare. Sometimes it gets to the point where you'll say, "It would have been cheaper to rewrite it from scratch."

Databases and Integrations

If a project includes a database and that database is poorly designed (i.e., relationships are incorrectly established, normalization has not been performed), trying to fix it later means risking data loss. Furthermore, if the project is connected to third-party services (such as payment systems, shipping integrations, SMS APIs), and it is unknown who made these connections and how they were made, the system may crash during the handover.

Licensing and Dependencies

If the software relies on paid libraries and tools, the original company must provide the license keys. If the license keys are missing or lost, the entire software becomes unusable. Checking this is the first step.

Things to Do Before the Takeover

Code Audit

The new software company must review all the code and submit a status report. This report should include the following:

  • Percentage of code completion
  • Known errors and omissions
  • Test status
  • External dependencies and licenses
  • Estimated completion time and cost.

This audit is essential for the business owner to make informed decisions. A cheap and quick audit can lead to more costly problems later on.

Drafting a Contract

The takeover agreement is very different from the contract you signed with the original contractor. When reviewing the essential clauses that should be included in a software contract , be sure to add the following to the takeover agreement:

  • Delivering the source code in a complete and accessible format.
  • Database backup and migration responsibility
  • Division of responsibility when communication with the former contractor is lost.
  • Refund terms (if completion is not possible)

Tasks to be completed with the former contractor.

If the original software company is still operating, obtain their permission . They should hand over the documentation, license keys, and access information. Legally, this is your right—if the code was written with your money, you are entitled to receive the code in its entirety.

What is the acquisition cost?

The cost of the acquisition varies depending on the project's status. However, generally speaking:

  • If the code quality is good: The completion cost could be as little as 20-40% of the project budget.
  • If the code quality is poor: The cost of takeover and completion may be equal to or greater than rewriting it from scratch .
  • If the integrations are complex: The onboarding period may be longer, and the cost may increase.

Therefore, the first step is to find the answer to the question, "Should I really take over this, or should I rewrite it from scratch?"

Software Acquisition Services in Alanya

As a team that has completed over 1000 projects in Alanya and surrounding areas since 2000, we frequently encounter unfinished projects. Our approach of understanding the needs of businesses enables us to successfully solve these kinds of problems.

In the acquisition process, we do the following:

  • Full code audit and status report.
  • Completion plan and timeline
  • Solving problems in a test environment.
  • Ensuring the transition to the live environment.
  • Complete delivery of source code to the customer.

To learn more about our work , you can check out our projects on our Instagram page .

Tips for Success in Inherited Projects

Choose your software company carefully.

The company taking over the project should be familiar with working with the legacy code . Companies that only work on new projects may have difficulty resolving problematic code.

Communicate directly.

You need to be able to communicate directly with the engineer who created the fog. Quick decisions are needed during the takeover—mediation is an obstacle in this process.

Obtain a Scope Document

You should request a written scope document from the software company and make it clear what is included and what is not. We've seen that simply saying "do this too" doubles the cost during the takeover.

Conclusion: Takeover or Rewriting?

An unfinished software project can be taken over, but it's not always a sensible option. Before making a decision:

  • Perform a code check.
  • Don't estimate the completion cost—calculate it.
  • Request permission from the old company.
  • Keep the contract clear.

If you are in this situation in Alanya, just write to us. We'll listen to your code and tell you what can be done. You can find us via the map or contact us directly. Like many business owners, you will realize that we can solve this problem.

Alanya özel yazılım Alanya yazılım firması web tabanlı uygulama randevu sistemi entegrasyon

Let's discuss your project.

Tell us your needs, and we'll outline the scope and get back to you with a clear offer.

Get a Quote

Related posts